北京品茶私人工作室,长沙品茶全套外卖,厦门蒲神论坛zzyccc,xhl.小红楼论坛

Introduction of Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu (24.4km)&LOT5: Ruvumbu-Kibuye (41.6km)

Completed section of the Project

Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu (24.4km)&LOT5: Ruvumbu-Kibuye (41.6km) is located in NYAMASHEKE City and KARONGI City, which KARONGI City is the capital city of the western province of the Republic of Rwanda. The project is the main thoroughfare of economic, trade exchanges and tourism for the East Africa along the Great Lakes region, and also belonging to the fourth and fifth tenders of Rwanda, Congo (DRC) and Burundi along the Kivu Lake Multinational Highway Project.

The project is invested by Export-Import Bank of China and the client is the Rwanda Transportation Development Agency, with a Canadian CIMA consulting firm. The total length of the project is 66Km, the design speed is 40Km/h, the roadbed standard width is 12m, the traffic lane width is 7m, with the asphalt concrete layer on the whole road. In addition five new bridges are built along the project.

 

Completed section of the Project

The project was officially launched on July 29, 2013 and was successfully completed on April 30, 2016.

As the project adjacent to the Lake Kivu, after the opening of the road, it is immediately promoted to be the most beautiful road in Rwanda.

缙云县fbw425| 两当县2fs547| 彭水iim153| 榆树市ox2384| 蒙自县urw724| 老河口市k3g784| 正定县ibz763| 于田县3zm200| 东乌jb3169| 寻甸ife911| 安国市j1n799| 浮山县jwo358| 故城县1dk420| 平武县ks1643| 炎陵县pmn814| 明水县gar692| 舞钢市b2m863