北京品茶私人工作室,长沙品茶全套外卖,厦门蒲神论坛zzyccc,xhl.小红楼论坛

The Construction Project of Datong-Xi’an Railway Passenger-dedicated Stations Section 14

 
 

The construction of Datong-Xi’an High-speed Railway started in March, 2010. With a length of 859km, it is a high-speed railway with the highest station-setting proportion in China. It is an important component of China Medium and Long-term Plan for Railway Network, and also a province-crossing key railway project which was first completed in China in 2014. The section undertaken by CRBC, located in Weinan City in Shanxi Province and Lintong District in Xi’an City, is a double-track high-speed railway passenger-dedicated line with a design speed of 250km/h and a length of 46.44km. Its construction mainly consists of bridge, culvert, laying of ballastless track bed, relocation of road, one elevated railway station and three-electricity relocation and change, etc.


 

 

 

双城市cqf124| 镇远县x9a467| 阿拉尔市jzk296| 乐昌市9od195| 湘潭县og9216| 兰坪ysd50| 阿拉善盟x7n909| 青神县xlx263| 顺昌县7ct660| 建湖县7ku748| 铜鼓县og8159| 青海省cpi701| 上栗县p8t73| 徐州市wcj402| 谢通门县8sj454| 怀仁县ia8703| 涟源市kad739