The Construction Project of Nanjing–Anqing Railway Section Ⅴ

The Construction Project of NanjingtAnqing Railway Section Ⅴ, known as Section NASZ-5 of South Nanjing-East Tongling Chizhou-Anqing Section of Newly-built Nanjing-Anqing Railway, is a double-track passenger-dedicated railway project with a design speed of over 200Km/H. Its construction mainly consists of relocation of existing roads, bridge, tunnel and track. The contract for the project was signed on January 11, 2010, and it passed the preliminary inspection after completion in July, 2015.