北京品茶私人工作室,长沙品茶全套外卖,厦门蒲神论坛zzyccc,xhl.小红楼论坛

Central Land Reclamation Project Phase 3 in Hong Kong

Effect picture of the Project

The project located in Victoria Harbor, between the No.7 Harbor and H.K Convention and Exhibition Center. It was started in Aug. 2003, completed in Dec. 2005, included coastal levee caisson, the prefabrication, transportation and installation of pump house constructed by CRBC (H.K). The whole area of the project occupies 18 ha, and the sea embankment is 1.2km in length.

主站蜘蛛池模板: 新营市| 缙云县| 马公市| 台江县| 大洼县| 定边县| 凤城市| 永城市| 天柱县| 闻喜县| 福州市| 乡城县| 呼伦贝尔市| 昌图县| 三门县| 扎鲁特旗| 万荣县| 新巴尔虎左旗| 来凤县| 灵台县| 深州市| 阳曲县| 崇明县| 崇义县| 务川| 鄂托克前旗| 汝州市| 元谋县| 革吉县| 固原市| 辛集市| 临海市| 姜堰市| 自治县| 嘉黎县| 古蔺县| 黄石市| 开江县| 辉县市| 天峻县| 岗巴县|